Biopore Installations Continue within the Scope of the Zero Waste Project
Paylaş:
Yayın Tarihi : 29/05/2025
Environmental efforts carried out within the framework of the Zero Waste Project. The biopore system has been expanded in line with positive feedback and increasing need.
Within the scope of the project, the second biopore installation has been completed, significantly expanding the area covered by the system. With the new installation, both the reintroduction of organic waste to nature and the feeding of underground water resources by rainwater have been made more effective.